Purusothaman Ramanujam

Purusothaman Ramanujam

Personal Blog

23 Jan 2012

TIME=NOLIMIT and TIME=MAXIMUM

We can specify the max limit of TIME parameter as

TIME=NOLIMIT

TIME=MAXIMUM

Now which specification gives maximum time for a JOB?

TIME=MAXIMUM will allow the job to run for 357912 minutes (248.55 days)

TIME=NOLIMIT will allow the job for unlimited amount of time

Another advantage of NOLIMIT option is that it can remain in wait status for more than the installation time limit.

Categories